Passar para o conteúdo principal

Antiguo puente del ferrocarril

Cidade mais próxima:

Vilagarcía de Arousa

Aprender mais sobre
Pontevedra

36002 Pontevedra
Spain

Teléfono
The building of this bridge started in 1898. The structure was finished in one year. To build it, they needed to put two masonry stirrups in the margins and two large pairs of cylindrical metal piles braced in the middle of the river. Finally, the railway line to Santiago started working on 23 July 1899 and the bridge was used for 67 years.
Aprender mais sobre
Pontevedra
Avaliar este recurso

O tempo nesta zona

Descrição do ambiente
Urbano
Cronologia
S. XIX
Organismo responsável
Concello de Pontevedra
Imóveis
Público
Estado de conservação
Necessidade de reabilitação