Antiguo puente del ferrocarril
Nearest city:
Vilagarcía de Arousa
36002 Pontevedra
Spain
Teléfono
The building of this bridge started in 1898. The structure was finished in one year. To build it, they needed to put two masonry stirrups in the margins and two large pairs of cylindrical metal piles braced in the middle of the river. Finally, the railway line to Santiago started working on 23 July 1899 and the bridge was used for 67 years.
Rate this resource
The weather in this area
Description of the environment
Urban
Chronology
S. XIX
Responsible body
Concello de Pontevedra
Property
Public
State of conservation
In need of rehabilitation